01 — Pretreatment
Ninghai Food & Kitchen Waste Pretreatment System
The Ninghai project provides pretreatment for a combined food-waste and kitchen-waste stream of 200 tonnes per day. The project scope covered the pretreatment process section, integrating coarse separation, pulping and screening, grit and contaminant removal, and three-phase oil recovery before downstream treatment. The system was commissioned in 2021.
Scope
- Pretreatment process engineering
- Coarse separation
- Pulping and screening
- Grit and contaminant removal
- Three-phase oil recovery


02 — Wastewater treatment
Jianyang Organic Waste Resource Recovery Project
The Jianyang project supports a two-phase food and kitchen waste resource-recovery facility. The project scope covered the wastewater-treatment process section, with Phase 1 and Phase 2 each designed around 100 tonnes per day and a shared wastewater system with a combined treatment capacity of 200 tonnes per day. The system was commissioned in January 2025.
Scope
- Wastewater process engineering
- Process-section EPC
- Shared wastewater treatment
- Equipment and process integration


03 — On-site installation
Kazakhstan 1,000 kg/day Food Waste Treatment Installation
A 1,000 kg/day food-waste treatment system was delivered, installed and commissioned for a local customer in Kazakhstan. The regional partner supported equipment delivery, on-site installation, operator training and technical assistance, providing local support as the system entered operation.
Scope
- Equipment delivery
- Installation
- Commissioning
- Operator training
- Local technical support


04 — Compact urban installation
Hong Kong On-Site Waste-to-Compost Installation
Installed in a compact urban setting in Hong Kong, the system brings organic-waste treatment close to the point of generation. The installation combines a stainless-steel treatment unit, dedicated lifting and feeding equipment, and protected outdoor housing configured around the available service space.
Scope
- Site-specific equipment arrangement
- Outdoor equipment protection
- Bin lifting and feeding
- On-site organic waste treatment


Start a conversation
Planning an organic waste project?
Share your waste stream, daily volume, available space and downstream requirements. Our team will help define an appropriate process and equipment configuration.